|
محل اجرا :
Khuzestan, Abadan
|
Conducting basic design, study, review and approval of fundamental engineering, detailed design, procurement, supply and delivery of materials, equipment and machinery made domestically and abroad, installation and commissioning of facilities and construction work, provisional and final handover as EPC
|
National Iranian Cupper Industries Company
|
محل اجرا :
Rafsanjan, kerman, Iran
|
Design, purchase, construction and installation of a new oxygen plant with a capacity of 350 tons per day (about 16,000 normal cubic meters per hour) Industrial oxygen with a purity of at least 95% in Sarcheshmeh copper complex
|
National Iranian Copper Industries Co.
|
محل اجرا :
Shahrak Mes Sarcheshmeh, Rafsanjan, Kerman, Iran
|
Construct sarcheshmeh copper complex with a nominal capacity of 875 TPD cathodic copper from copper concentrate
|
|
محل اجرا :
Damghan, Semnan , Iran
|
|
Iran Liquefied Natural Gas Co.
|
محل اجرا :
Bushehr, Asaluyeh
|
|
Sadra Petrochemical Company
|
محل اجرا :
Mahshar Special Economic Zone
|
BENZENE & GASOLINE PRODUCTION PLAN FROM MARUN PETROCHEMICAL PYROLYSIS GASOLINE Provision of technical knowledge, design and engineering, supply, construction and installation of process, utility and offsite units.
|
Arfa Iron & Steel Company
|
محل اجرا :
Yazd Province
|
design, engineering, procurement, construction, pre-commissioning and commissioning for arfa iron & steel company lng peak shaving plant with a capacity of 100 tons per day and storage tanks (2 tanks with an effective capacity of 27500 cubic meters of lng)
|
National Iranian South Oil Company (NISOC)
|
محل اجرا :
Ahvaz, Khuzestan, Iran
|
Basic Design Review and Endorsement, Detail Design and Engineering, Procurement of equipment and materials, Construction, Commissioning and Start up of a Desalting Unit which aims reduction of existing salt and water in crude oil less than 29g/m3 and 0.15% respectively. The project is a multidisciplinary job which includes Gas Separators, Heat Exchangers, Pump Stations, Oil […]
|
|
محل اجرا :
Bandar Imam, Khuzestan, Iran
|
Engineering, procurement and supply of materials and equipment and all operations of construction, installation and pre-commissioning of devices and installation of pipes and cables of two ASU units in Arvand Petrochemical Complex
|
South Pars Gas Complex Company
|
محل اجرا :
Sixth Refinery, Assaluyeh, Bushehr Province
|
Supply, installation, and commissioning of the implementation section for projects to reduce flaring and SO2 gas emissions at the sixth refinery of the South Pars Gas Complex
|
National Iranian South Oil Company (NISOC)
|
محل اجرا :
Ahvaz, Khuzestan, Iran
|
Basic Design Review and Endorsement, Detail Design and Engineering, Procurement of equipment and materials, Construction, Commissioning and Start up of a Desalting Unit which aims reduction of existing salt and water in crude oil less than 29g/m3 and 0.15% respectively. The project is a multidisciplinary job which includes Gas Separators, Heat Exchangers, Pump Stations, Oil […]
|
Zagros Green Fuel Development
|
محل اجرا :
Kermanshah, Iran
|
Kermanshah bioethanol fuel and by-products production project with a capacity of 200,000 liters per day
|
Iran Power Development Company (IPDC)
|
محل اجرا :
Damavand, Tehran, Iran
|
Construction, procurement, supply, and delivery of all materials, supplies, tools, and primary and ancillary equipment required for facilities and auxiliary systems of 5 fuel storage tanks, performing factory tests, carrying out all construction operations, supplying, installing, and commissioning fire and steam systems for fuel tanks, completing the auxiliary boiler system, painting one tank and its […]
|
Fars Province Gas Company
|
محل اجرا :
Shiraz, Fars, Iran
|
Complete construction of a 400,000 cubic meter C.G.S Pressure Reduction Station project along with all the auxiliary installations provided in the quantities provided by the supply of equipment and installations in Shiraz Petrochemical Company.
|